Restructured project from nested workspace pattern to flat single-repo layout. This eliminates redundant nesting and consolidates all project files under version control. ## Migration Summary **Before:** ``` alex/ (workspace, not versioned) ├── chess-game/ (git repo) │ ├── js/, css/, tests/ │ └── index.html └── docs/ (planning, not versioned) ``` **After:** ``` alex/ (git repo, everything versioned) ├── js/, css/, tests/ ├── index.html ├── docs/ (project documentation) ├── planning/ (historical planning docs) ├── .gitea/ (CI/CD) └── CLAUDE.md (configuration) ``` ## Changes Made ### Structure Consolidation - Moved all chess-game/ contents to root level - Removed redundant chess-game/ subdirectory - Flattened directory structure (eliminated one nesting level) ### Documentation Organization - Moved chess-game/docs/ → docs/ (project documentation) - Moved alex/docs/ → planning/ (historical planning documents) - Added CLAUDE.md (workspace configuration) - Added IMPLEMENTATION_PROMPT.md (original project prompt) ### Version Control Improvements - All project files now under version control - Planning documents preserved in planning/ folder - Merged .gitignore files (workspace + project) - Added .claude/ agent configurations ### File Updates - Updated .gitignore to include both workspace and project excludes - Moved README.md to root level - All import paths remain functional (relative paths unchanged) ## Benefits ✅ **Simpler Structure** - One level of nesting removed ✅ **Complete Versioning** - All documentation now in git ✅ **Standard Layout** - Matches open-source project conventions ✅ **Easier Navigation** - Direct access to all project files ✅ **CI/CD Compatible** - All workflows still functional ## Technical Validation - ✅ Node.js environment verified - ✅ Dependencies installed successfully - ✅ Dev server starts and responds - ✅ All core files present and accessible - ✅ Git repository functional ## Files Preserved **Implementation Files:** - js/ (3,517 lines of code) - css/ (4 stylesheets) - tests/ (87 test cases) - index.html - package.json **CI/CD Pipeline:** - .gitea/workflows/ci.yml - .gitea/workflows/release.yml **Documentation:** - docs/ (12+ documentation files) - planning/ (historical planning materials) - README.md **Configuration:** - jest.config.js, babel.config.cjs, playwright.config.js - .gitignore (merged) - CLAUDE.md 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude <noreply@anthropic.com>
360 lines
9.8 KiB
Markdown
360 lines
9.8 KiB
Markdown
# Approval Status - Chess Game Planning Review
|
|
|
|
**Review Date**: 2025-11-22
|
|
**Swarm ID**: swarm-1763844423540-zqi6om5ev
|
|
**Reviewer**: Reviewer Agent (Worker 6)
|
|
**Review Type**: Planning Phase Gate Review
|
|
|
|
---
|
|
|
|
## APPROVAL DECISION
|
|
|
|
### ❌ **REJECTED - NOT APPROVED FOR IMPLEMENTATION**
|
|
|
|
**Reason**: No planning deliverables were produced. The planning phase is incomplete.
|
|
|
|
---
|
|
|
|
## Status Summary
|
|
|
|
| Criteria | Required | Actual | Status |
|
|
|----------|----------|--------|--------|
|
|
| **Deliverables** | | | |
|
|
| Planning Documents | 8+ docs | 0 docs | ❌ FAIL |
|
|
| Total Word Count | >10,000 | 0 | ❌ FAIL |
|
|
| Code Templates | 5+ files | 0 files | ❌ FAIL |
|
|
| Test Specifications | 50+ cases | 0 cases | ❌ FAIL |
|
|
| Architecture Diagrams | 3+ diagrams | 0 diagrams | ❌ FAIL |
|
|
| **Quality Gates** | | | |
|
|
| Completeness | ≥80% | 0% | ❌ FAIL |
|
|
| Consistency | ≥90% | N/A | ⚠️ N/A |
|
|
| Quality Score | ≥80% | 0% | ❌ FAIL |
|
|
| Chess Rules Accuracy | 100% | N/A | ❌ FAIL |
|
|
| Implementation Readiness | ≥85% | 0% | ❌ FAIL |
|
|
| **OVERALL** | **PASS** | **FAIL** | **❌ REJECTED** |
|
|
|
|
---
|
|
|
|
## Gate Review Results
|
|
|
|
### Gate 1: Planning Complete ❌ FAILED
|
|
- [ ] All required documents created
|
|
- [ ] Chess rules fully specified
|
|
- [ ] Architecture designed
|
|
- [ ] Data models defined
|
|
- [ ] Test strategy documented
|
|
|
|
**Result**: ❌ **FAILED** - No documents created
|
|
|
|
---
|
|
|
|
### Gate 2: Technical Soundness ⚠️ CANNOT ASSESS
|
|
- [ ] Chess rules accurate per FIDE
|
|
- [ ] Algorithms efficient and correct
|
|
- [ ] Data models properly structured
|
|
- [ ] Technology stack justified
|
|
- [ ] Dependencies identified
|
|
|
|
**Result**: ⚠️ **CANNOT ASSESS** - No technical artifacts to review
|
|
|
|
---
|
|
|
|
### Gate 3: Quality Standards ❌ FAILED
|
|
- [ ] Documentation clear and complete
|
|
- [ ] Code templates follow best practices
|
|
- [ ] Test coverage comprehensive
|
|
- [ ] Accessibility considered
|
|
- [ ] Performance addressed
|
|
|
|
**Result**: ❌ **FAILED** - No quality to assess
|
|
|
|
---
|
|
|
|
### Gate 4: Implementation Ready ❌ FAILED
|
|
- [ ] Implementation guide clear
|
|
- [ ] File structure specified
|
|
- [ ] Setup instructions provided
|
|
- [ ] Examples included
|
|
- [ ] No ambiguities remaining
|
|
|
|
**Result**: ❌ **FAILED** - Not ready for implementation
|
|
|
|
---
|
|
|
|
## Critical Blockers
|
|
|
|
### Blocker 1: No Deliverables Produced (CRITICAL)
|
|
**Severity**: 🔴 CRITICAL
|
|
**Impact**: Cannot proceed to implementation
|
|
**Resolution Required**: Produce all planning documentation
|
|
**Timeline**: Must complete before approval
|
|
|
|
### Blocker 2: Chess Rules Not Specified (CRITICAL)
|
|
**Severity**: 🔴 CRITICAL
|
|
**Impact**: Implementation team doesn't know what to build
|
|
**Resolution Required**: Complete chess rules documentation
|
|
**Timeline**: Required for approval
|
|
|
|
### Blocker 3: No Architecture Design (CRITICAL)
|
|
**Severity**: 🔴 CRITICAL
|
|
**Impact**: No technical direction for implementation
|
|
**Resolution Required**: Create system architecture and data models
|
|
**Timeline**: Required for approval
|
|
|
|
### Blocker 4: No Implementation Guide (CRITICAL)
|
|
**Severity**: 🔴 CRITICAL
|
|
**Impact**: Implementation team has no roadmap
|
|
**Resolution Required**: Create step-by-step implementation guide
|
|
**Timeline**: Required for approval
|
|
|
|
### Blocker 5: No Test Strategy (HIGH)
|
|
**Severity**: 🟡 HIGH
|
|
**Impact**: Quality cannot be verified
|
|
**Resolution Required**: Define test strategy and test cases
|
|
**Timeline**: Required for approval
|
|
|
|
---
|
|
|
|
## Approval Criteria
|
|
|
|
### Minimum Requirements for Approval
|
|
|
|
**Documentation** (MUST HAVE):
|
|
- ✅ Chess rules specification (>2000 words)
|
|
- ✅ System architecture document (>1500 words + diagrams)
|
|
- ✅ Data models specification (>1000 words)
|
|
- ✅ Implementation guide (>2000 words)
|
|
- ✅ Code templates (5+ files with examples)
|
|
- ✅ Test specifications (>1500 words)
|
|
- ✅ Test cases (50+ scenarios)
|
|
- ✅ Best practices guide (>1000 words)
|
|
|
|
**Quality Standards** (MUST MEET):
|
|
- Completeness: ≥80%
|
|
- Consistency: ≥90%
|
|
- Quality: ≥80%
|
|
- Accuracy: 100% (for chess rules)
|
|
- Implementation Readiness: ≥85%
|
|
|
|
**Technical Requirements** (MUST ADDRESS):
|
|
- All chess piece movements specified
|
|
- Special moves documented (castling, en passant, promotion)
|
|
- Check/checkmate/stalemate logic defined
|
|
- Board representation chosen and justified
|
|
- Move validation approach designed
|
|
- Game state management specified
|
|
|
|
---
|
|
|
|
## Current Status vs. Requirements
|
|
|
|
### Documentation Status
|
|
| Document | Required | Status | Completion |
|
|
|----------|----------|--------|------------|
|
|
| Chess Rules | YES | ❌ Missing | 0% |
|
|
| Best Practices | YES | ❌ Missing | 0% |
|
|
| System Architecture | YES | ❌ Missing | 0% |
|
|
| Data Models | YES | ❌ Missing | 0% |
|
|
| Implementation Guide | YES | ❌ Missing | 0% |
|
|
| Code Templates | YES | ❌ Missing | 0% |
|
|
| Test Strategy | YES | ❌ Missing | 0% |
|
|
| Test Cases | YES | ❌ Missing | 0% |
|
|
| **TOTAL** | **8 docs** | **0 docs** | **0%** |
|
|
|
|
---
|
|
|
|
## Review Findings Summary
|
|
|
|
### Completeness Assessment
|
|
- **Score**: 0/10 (0%)
|
|
- **Status**: ❌ UNACCEPTABLE
|
|
- **Details**: No planning artifacts exist
|
|
- **Required Actions**: Complete all planning documentation
|
|
|
|
### Consistency Assessment
|
|
- **Score**: N/A (cannot assess)
|
|
- **Status**: ⚠️ PENDING
|
|
- **Details**: No artifacts to check for consistency
|
|
- **Required Actions**: Create artifacts, then assess
|
|
|
|
### Quality Assessment
|
|
- **Score**: 0/10 (0%)
|
|
- **Status**: ❌ UNACCEPTABLE
|
|
- **Details**: No deliverables to assess quality
|
|
- **Required Actions**: Produce deliverables meeting quality standards
|
|
|
|
### Implementation Readiness
|
|
- **Score**: 0/10 (0%)
|
|
- **Status**: ❌ NOT READY
|
|
- **Details**: No implementation materials exist
|
|
- **Required Actions**: Create complete implementation guide
|
|
|
|
---
|
|
|
|
## Recommendations for Approval
|
|
|
|
### Immediate Actions Required
|
|
|
|
1. **RESTART PLANNING PHASE** (CRITICAL)
|
|
- Re-run planning swarm with task execution
|
|
- Assign specific deliverable tasks to workers
|
|
- Validate outputs are created
|
|
|
|
2. **PRODUCE ALL PLANNING DOCUMENTS** (CRITICAL)
|
|
- Chess rules specification
|
|
- System architecture
|
|
- Data models
|
|
- Implementation guide
|
|
- Code templates
|
|
- Test specifications
|
|
|
|
3. **MEET QUALITY STANDARDS** (REQUIRED)
|
|
- Ensure completeness ≥80%
|
|
- Verify consistency ≥90%
|
|
- Achieve quality score ≥80%
|
|
- Validate chess rules 100% accurate
|
|
|
|
4. **ENABLE IMPLEMENTATION** (REQUIRED)
|
|
- Provide clear implementation roadmap
|
|
- Include code examples
|
|
- Specify file structure
|
|
- Define setup process
|
|
|
|
---
|
|
|
|
## Timeline to Approval
|
|
|
|
### Estimated Timeline
|
|
|
|
**Phase 1: Planning Execution** (6-12 hours)
|
|
- Workers produce all documentation
|
|
- Peer review and refinement
|
|
- Output validation
|
|
|
|
**Phase 2: Re-Review** (2-4 hours)
|
|
- Reviewer assesses all deliverables
|
|
- Completeness check
|
|
- Consistency validation
|
|
- Quality assessment
|
|
|
|
**Phase 3: Revisions** (if needed) (2-6 hours)
|
|
- Address review feedback
|
|
- Fix inconsistencies
|
|
- Improve quality
|
|
|
|
**Phase 4: Final Approval** (1 hour)
|
|
- Final sign-off
|
|
- Handoff to implementation swarm
|
|
|
|
**Total**: 11-23 hours from restart to approval
|
|
|
|
---
|
|
|
|
## Conditional Approval Possibility
|
|
|
|
### NOT APPLICABLE
|
|
|
|
Conditional approval cannot be granted because:
|
|
- ❌ No partial deliverables exist
|
|
- ❌ No work-in-progress to evaluate
|
|
- ❌ No foundation to build upon
|
|
- ❌ Complete restart required
|
|
|
|
**Minimum for conditional approval**: At least 50% of documents at ≥60% quality
|
|
**Actual**: 0% of documents exist
|
|
|
|
---
|
|
|
|
## Sign-Off Authority
|
|
|
|
**Reviewer**: Reviewer Agent (Worker 6)
|
|
**Authority**: Planning Phase Gate Keeper
|
|
**Decision**: ❌ **REJECTED**
|
|
**Date**: 2025-11-22
|
|
**Re-Review Required**: YES - After planning deliverables created
|
|
|
|
---
|
|
|
|
## Approval Process
|
|
|
|
### Current Stage: ❌ STAGE 0 - PLANNING NOT STARTED
|
|
|
|
```
|
|
❌ STAGE 0: Planning Not Started ← YOU ARE HERE
|
|
↓
|
|
⚠️ STAGE 1: Planning In Progress
|
|
↓
|
|
⚠️ STAGE 2: Planning Complete, Under Review
|
|
↓
|
|
⚠️ STAGE 3: Revisions In Progress
|
|
↓
|
|
✅ STAGE 4: APPROVED FOR IMPLEMENTATION
|
|
```
|
|
|
|
**To Advance**: Complete planning phase and produce all deliverables
|
|
|
|
---
|
|
|
|
## Handoff Criteria (Not Met)
|
|
|
|
### Implementation Swarm Requirements
|
|
|
|
Before handoff to implementation swarm, the following MUST be provided:
|
|
|
|
- [ ] Complete chess rules specification
|
|
- [ ] System architecture and design
|
|
- [ ] Data models and schemas
|
|
- [ ] Implementation guide with examples
|
|
- [ ] Code templates and file structure
|
|
- [ ] Test specifications and test cases
|
|
- [ ] Best practices and standards
|
|
- [ ] References and resources
|
|
|
|
**Current Status**: 0/8 requirements met
|
|
|
|
---
|
|
|
|
## Contact for Questions
|
|
|
|
**Reviewer**: Reviewer Agent
|
|
**Swarm**: swarm-1763844423540-zqi6om5ev
|
|
**Role**: Quality gate keeper for planning phase
|
|
**Next Review**: After planning deliverables are submitted
|
|
|
|
---
|
|
|
|
## Appendix: Approval Stamp
|
|
|
|
```
|
|
╔═══════════════════════════════════════════╗
|
|
║ ║
|
|
║ APPROVAL STATUS ║
|
|
║ ║
|
|
║ ❌ REJECTED - NOT APPROVED ║
|
|
║ ║
|
|
║ Reason: No planning deliverables ║
|
|
║ ║
|
|
║ Reviewer: Reviewer Agent (Worker 6) ║
|
|
║ Date: 2025-11-22 ║
|
|
║ Swarm: swarm-1763844423540-zqi6om5ev ║
|
|
║ ║
|
|
║ Required Action: RESTART PLANNING ║
|
|
║ ║
|
|
╚═══════════════════════════════════════════╝
|
|
```
|
|
|
|
---
|
|
|
|
**FINAL DECISION**: ❌ **NOT APPROVED FOR IMPLEMENTATION**
|
|
|
|
**Next Steps**:
|
|
1. Restart planning phase
|
|
2. Produce all required documentation
|
|
3. Submit for re-review
|
|
4. Address any feedback
|
|
5. Obtain final approval
|
|
|
|
---
|
|
|
|
**This decision is final until planning deliverables are submitted for re-review.**
|