Initial implementation of HTTP Sender Plugin following TDD methodology with hexagonal architecture. All 313 tests passing (0 failures). This commit adds: - Complete domain model and port interfaces - All adapter implementations (HTTP, gRPC, file logging, config) - Application services (data collection, transmission, backpressure) - Comprehensive test suite with 18 integration tests Test fixes applied during implementation: - Fix base64 encoding validation in DataCollectionServiceIntegrationTest - Fix exception type handling in IConfigurationPortTest - Fix CompletionException unwrapping in IHttpPollingPortTest - Fix sequential batching in DataTransmissionServiceIntegrationTest - Add test adapter failure simulation for reconnection tests - Use adapter counters for gRPC verification Files added: - pom.xml with all dependencies (JUnit 5, Mockito, WireMock, gRPC, Jackson) - src/main/java: Domain model, ports, adapters, application services - src/test/java: Unit tests, integration tests, test utilities
702 lines
19 KiB
Markdown
702 lines
19 KiB
Markdown
# HSP Sprint Planning Board
|
|
|
|
**Project**: HTTP Sender Plugin (HSP)
|
|
**Version**: 1.0
|
|
**Last Updated**: 2025-11-20
|
|
**Sprint Duration**: 2 weeks
|
|
**Total Sprints**: 6
|
|
**Team Velocity**: TBD (will be calculated after Sprint 1)
|
|
|
|
---
|
|
|
|
## Sprint Overview
|
|
|
|
| Sprint | Duration | Story Points | Status | Start Date | End Date | Completed | Velocity |
|
|
|--------|----------|--------------|--------|------------|----------|-----------|----------|
|
|
| **Sprint 1** | Weeks 1-2 | 38 | 🎯 Ready | TBD | TBD | 0 | - |
|
|
| **Sprint 2** | Weeks 3-4 | 42 | ⏳ Pending | TBD | TBD | 0 | - |
|
|
| **Sprint 3** | Weeks 5-6 | 40 | ⏳ Pending | TBD | TBD | 0 | - |
|
|
| **Sprint 4** | Week 7 | 35 | ⏳ Pending | TBD | TBD | 0 | - |
|
|
| **Sprint 5** | Week 8 | 42 | ⏳ Pending | TBD | TBD | 0 | - |
|
|
| **Sprint 6** | Weeks 9-10 | 35 | ⏳ Pending | TBD | TBD | 0 | - |
|
|
|
|
**Total Story Points**: 232
|
|
**Target Velocity**: 35-40 points per sprint
|
|
|
|
---
|
|
|
|
## Sprint 1: Foundation & Quick Wins (Weeks 1-2)
|
|
|
|
**Sprint Goal**: Establish project foundation, implement architectural enhancements, and set up TDD workflow
|
|
|
|
**Status**: 🎯 Ready to Start
|
|
**Story Points**: 38
|
|
**Team Size**: 3-4 developers
|
|
**Planned Velocity**: 38 points
|
|
**Actual Velocity**: -
|
|
|
|
### User Stories
|
|
|
|
#### US-1.1: Implement Rate Limiting
|
|
**Story Points**: 3
|
|
**Priority**: High
|
|
**Status**: ⏳ Not Started
|
|
**Assigned**: -
|
|
|
|
**Description**:
|
|
As a system architect, I want to implement rate limiting for HTTP polling so that we don't overwhelm endpoints with requests.
|
|
|
|
**Acceptance Criteria**:
|
|
- [ ] RateLimitedHttpPollingAdapter decorator created
|
|
- [ ] Configurable requests-per-second limit
|
|
- [ ] Tests written BEFORE implementation (TDD RED)
|
|
- [ ] Implementation passes tests (TDD GREEN)
|
|
- [ ] Code refactored for quality (TDD REFACTOR)
|
|
- [ ] 95% test coverage achieved
|
|
- [ ] Configuration schema updated
|
|
- [ ] Integration tests with HttpPollingAdapter
|
|
|
|
**Technical Tasks**:
|
|
1. Write failing test for rate limiter (RED)
|
|
2. Implement RateLimitedHttpPollingAdapter (GREEN)
|
|
3. Write tests for configuration loading
|
|
4. Refactor for clarity (REFACTOR)
|
|
5. Add integration tests
|
|
|
|
**Dependencies**: None
|
|
**Estimated Effort**: 1 day
|
|
|
|
---
|
|
|
|
#### US-1.2: Implement Backpressure Controller
|
|
**Story Points**: 5
|
|
**Priority**: High
|
|
**Status**: ⏳ Not Started
|
|
**Assigned**: -
|
|
|
|
**Description**:
|
|
As a developer, I want backpressure handling so that the system can slow down when the buffer is full.
|
|
|
|
**Acceptance Criteria**:
|
|
- [ ] BackpressureController class created
|
|
- [ ] Buffer monitoring every 100ms
|
|
- [ ] Backpressure signal at 80% threshold
|
|
- [ ] HTTP polling skip logic implemented
|
|
- [ ] Tests written BEFORE implementation (TDD RED)
|
|
- [ ] All tests pass (TDD GREEN)
|
|
- [ ] 95% test coverage
|
|
- [ ] Integration tests with BufferManager
|
|
|
|
**Technical Tasks**:
|
|
1. Write failing tests for backpressure detection (RED)
|
|
2. Implement BackpressureController (GREEN)
|
|
3. Write tests for buffer monitoring
|
|
4. Implement polling skip logic
|
|
5. Integration tests with DataCollectionService
|
|
6. Refactor for performance
|
|
|
|
**Dependencies**: BufferManager interface defined
|
|
**Estimated Effort**: 2 days
|
|
|
|
---
|
|
|
|
#### US-1.3: Achieve 95%/90% Test Coverage
|
|
**Story Points**: 8
|
|
**Priority**: High
|
|
**Status**: ⏳ Not Started
|
|
**Assigned**: QA Engineer + Developers
|
|
|
|
**Description**:
|
|
As a QA engineer, I want to establish comprehensive test coverage so that we meet EN 50716 compliance requirements.
|
|
|
|
**Acceptance Criteria**:
|
|
- [ ] JaCoCo configured with 95% line, 90% branch thresholds
|
|
- [ ] PIT mutation testing configured
|
|
- [ ] Maven build fails on coverage threshold violation
|
|
- [ ] CI/CD pipeline includes coverage checks
|
|
- [ ] MC/DC tests for safety-critical components
|
|
- [ ] Coverage reports generated and published
|
|
- [ ] Gap analysis document created
|
|
|
|
**Technical Tasks**:
|
|
1. Configure JaCoCo plugin in Maven POM
|
|
2. Set up coverage thresholds
|
|
3. Configure PIT mutation testing
|
|
4. Create CI/CD coverage job
|
|
5. Analyze existing coverage gaps
|
|
6. Write missing unit tests
|
|
7. Add MC/DC tests for critical paths
|
|
8. Generate coverage reports
|
|
|
|
**Dependencies**: Maven project setup
|
|
**Estimated Effort**: 3-5 days
|
|
|
|
---
|
|
|
|
#### US-1.4: Set Up Maven Project
|
|
**Story Points**: 3
|
|
**Priority**: High
|
|
**Status**: ⏳ Not Started
|
|
**Assigned**: Build Engineer
|
|
|
|
**Description**:
|
|
As a build engineer, I want to set up the Maven project structure so that developers can start implementing components.
|
|
|
|
**Acceptance Criteria**:
|
|
- [ ] Multi-module Maven structure created
|
|
- [ ] All dependencies configured (gRPC, Jackson, etc.)
|
|
- [ ] JaCoCo configured with thresholds
|
|
- [ ] Fat JAR packaging configured
|
|
- [ ] Test framework configured (JUnit 5, Mockito, WireMock)
|
|
- [ ] Project builds successfully
|
|
- [ ] README with build instructions created
|
|
|
|
**Technical Tasks**:
|
|
1. Create root pom.xml
|
|
2. Define module structure
|
|
3. Configure dependencies
|
|
4. Configure JaCoCo plugin
|
|
5. Configure maven-assembly-plugin for fat JAR
|
|
6. Set up test dependencies
|
|
7. Create .gitignore
|
|
8. Write README.md
|
|
|
|
**Dependencies**: None
|
|
**Estimated Effort**: 1 day
|
|
|
|
---
|
|
|
|
#### US-1.5: Define All Port Interfaces
|
|
**Story Points**: 8
|
|
**Priority**: High
|
|
**Status**: ⏳ Not Started
|
|
**Assigned**: Architect + Senior Developer
|
|
|
|
**Description**:
|
|
As an architect, I want to define all port interfaces so that developers can implement adapters independently.
|
|
|
|
**Acceptance Criteria**:
|
|
- [ ] 8 port interfaces created (3 primary, 5 secondary)
|
|
- [ ] Javadoc with requirement traceability
|
|
- [ ] Interface contracts defined (method signatures, exceptions)
|
|
- [ ] Tests written for each interface contract (TDD)
|
|
- [ ] 100% requirement traceability annotations
|
|
- [ ] Architecture review approved
|
|
|
|
**Port Interfaces**:
|
|
1. **Primary Ports**:
|
|
- IConfigurationPort
|
|
- IHealthCheckPort
|
|
- ILifecyclePort
|
|
|
|
2. **Secondary Ports**:
|
|
- IHttpPollingPort
|
|
- IGrpcStreamPort
|
|
- ILoggingPort
|
|
- IBufferPort
|
|
- IStatisticsPort
|
|
|
|
**Technical Tasks**:
|
|
1. Design interface contracts (workshops)
|
|
2. Write contract tests (TDD RED)
|
|
3. Create interface definitions
|
|
4. Add comprehensive Javadoc
|
|
5. Add @RequirementTrace annotations
|
|
6. Architecture review
|
|
7. Update traceability matrix
|
|
|
|
**Dependencies**: None
|
|
**Estimated Effort**: 2 days
|
|
|
|
---
|
|
|
|
#### US-1.6: Implement Domain Models
|
|
**Story Points**: 5
|
|
**Priority**: High
|
|
**Status**: ⏳ Not Started
|
|
**Assigned**: Domain Expert + Developer
|
|
|
|
**Description**:
|
|
As a developer, I want immutable domain models so that I can safely share data across threads.
|
|
|
|
**Acceptance Criteria**:
|
|
- [ ] 4 domain models created (immutable value objects)
|
|
- [ ] Tests written BEFORE implementation (TDD RED)
|
|
- [ ] JSON serialization supported (Jackson)
|
|
- [ ] Base64 encoding implemented (DiagnosticData)
|
|
- [ ] 100% test coverage
|
|
- [ ] Thread-safety verified
|
|
|
|
**Domain Models**:
|
|
1. **DiagnosticData** (value object)
|
|
- url: String
|
|
- file_data: byte[]
|
|
- timestamp: Instant
|
|
- JSON serialization with Base64
|
|
|
|
2. **Configuration** (value object)
|
|
- collectorSenderCoreAddress: String
|
|
- httpEndpoints: List<EndpointConfig>
|
|
- bufferSize: int
|
|
- All validation rules
|
|
|
|
3. **HealthCheckResponse** (value object)
|
|
- status: String
|
|
- timestamp: Instant
|
|
- endpoints_total: int
|
|
- endpoints_successful: int
|
|
- buffer_usage: int
|
|
- dependencies: List<DependencyStatus>
|
|
|
|
4. **BufferStatistics** (value object)
|
|
- totalPolls: AtomicLong
|
|
- totalErrors: AtomicLong
|
|
- last30sMetrics: Queue
|
|
|
|
**Technical Tasks**:
|
|
1. Write tests for immutability (TDD RED)
|
|
2. Write tests for JSON serialization (TDD RED)
|
|
3. Implement DiagnosticData
|
|
4. Implement Configuration
|
|
5. Implement HealthCheckResponse
|
|
6. Implement BufferStatistics
|
|
7. Add Jackson annotations
|
|
8. Write thread-safety tests
|
|
9. Refactor for clarity
|
|
|
|
**Dependencies**: None
|
|
**Estimated Effort**: 2 days
|
|
|
|
---
|
|
|
|
#### US-1.7: TDD Training Workshop
|
|
**Story Points**: 3
|
|
**Priority**: High
|
|
**Status**: ⏳ Not Started
|
|
**Assigned**: Tech Lead + Architect
|
|
|
|
**Description**:
|
|
As a team lead, I want to train the team on TDD so that everyone follows the RED-GREEN-REFACTOR workflow.
|
|
|
|
**Acceptance Criteria**:
|
|
- [ ] 4-hour workshop completed
|
|
- [ ] TDD principles explained (RED-GREEN-REFACTOR)
|
|
- [ ] Live TDD demonstration performed
|
|
- [ ] Team practice session completed
|
|
- [ ] Git workflow for TDD documented
|
|
- [ ] Code review checklist for TDD created
|
|
- [ ] All team members certified
|
|
|
|
**Workshop Agenda**:
|
|
1. **Introduction (30 min)**
|
|
- Why TDD?
|
|
- RED-GREEN-REFACTOR cycle
|
|
- Benefits and challenges
|
|
|
|
2. **Live Demo (60 min)**
|
|
- Implement a simple component with TDD
|
|
- Show commit patterns
|
|
- Show test-first workflow
|
|
|
|
3. **Practice Session (90 min)**
|
|
- Pair programming exercise
|
|
- Implement BufferManager with TDD
|
|
- Code review of practice work
|
|
|
|
4. **Q&A and Best Practices (30 min)**
|
|
- Common pitfalls
|
|
- TDD in CI/CD
|
|
- Code review for TDD compliance
|
|
|
|
5. **Setup and Tools (30 min)**
|
|
- IDE test runners
|
|
- Coverage visualization
|
|
- Git workflow
|
|
|
|
**Deliverables**:
|
|
- TDD training slides
|
|
- Practice exercise
|
|
- Code review checklist
|
|
- TDD best practices document
|
|
|
|
**Dependencies**: None
|
|
**Estimated Effort**: 0.5 days (4 hours)
|
|
|
|
---
|
|
|
|
#### US-1.8: Environment Setup
|
|
**Story Points**: 3
|
|
**Priority**: High
|
|
**Status**: ⏳ Not Started
|
|
**Assigned**: All team members
|
|
|
|
**Description**:
|
|
As a developer, I want my development environment set up so that I can start coding.
|
|
|
|
**Acceptance Criteria**:
|
|
- [ ] JDK 25 installed and verified
|
|
- [ ] Maven 3.9+ installed
|
|
- [ ] IDE configured (IntelliJ/Eclipse)
|
|
- [ ] IDE plugins installed (TDD tools, coverage)
|
|
- [ ] Gitea repository cloned
|
|
- [ ] Git configured (user, email)
|
|
- [ ] CI/CD access verified
|
|
- [ ] Build verified locally
|
|
- [ ] TDD workflow tested
|
|
|
|
**Setup Checklist**:
|
|
1. **Software Installation**:
|
|
- Install JDK 25 (OpenJDK/Temurin)
|
|
- Install Maven 3.9+
|
|
- Install Git 2.40+
|
|
- Install IDE with Java 25 support
|
|
|
|
2. **IDE Configuration**:
|
|
- Install JUnit runner plugin
|
|
- Install coverage visualization plugin
|
|
- Configure code formatter
|
|
- Configure live test runner
|
|
|
|
3. **Repository Setup**:
|
|
- Clone from Gitea
|
|
- Configure Git user/email
|
|
- Set up SSH keys
|
|
- Verify build: `mvn clean compile`
|
|
|
|
4. **TDD Workflow Test**:
|
|
- Write simple test (RED)
|
|
- Make test pass (GREEN)
|
|
- Refactor (REFACTOR)
|
|
- Commit with proper message
|
|
|
|
5. **CI/CD Access**:
|
|
- Verify Gitea access
|
|
- Test push to feature branch
|
|
- Verify CI pipeline runs
|
|
|
|
**Dependencies**: Gitea repository created
|
|
**Estimated Effort**: 1 day (per team member)
|
|
|
|
---
|
|
|
|
### Sprint 1 Burndown Chart
|
|
|
|
```
|
|
Story Points Remaining
|
|
38 |█
|
|
|█
|
|
36 |█
|
|
|█
|
|
32 |█
|
|
|█
|
|
28 |█
|
|
|█
|
|
24 |█
|
|
|█
|
|
20 |█
|
|
|█
|
|
16 |█
|
|
|█
|
|
12 |█
|
|
|█
|
|
8 |█
|
|
|█
|
|
4 |█
|
|
|█
|
|
0 |█
|
|
+------------------
|
|
Day 1 3 5 7 9 10
|
|
```
|
|
|
|
**Status**: Will be updated daily
|
|
|
|
---
|
|
|
|
### Sprint 1 Daily Standup Tracking
|
|
|
|
| Day | Date | Stories In Progress | Blockers | Completed Today | Notes |
|
|
|-----|------|-------------------|----------|-----------------|-------|
|
|
| Day 1 | TBD | - | - | - | Sprint kickoff |
|
|
| Day 2 | TBD | - | - | - | - |
|
|
| Day 3 | TBD | - | - | - | - |
|
|
| Day 4 | TBD | - | - | - | - |
|
|
| Day 5 | TBD | - | - | - | - |
|
|
| Day 6 | TBD | - | - | - | - |
|
|
| Day 7 | TBD | - | - | - | - |
|
|
| Day 8 | TBD | - | - | - | - |
|
|
| Day 9 | TBD | - | - | - | - |
|
|
| Day 10 | TBD | - | - | - | Sprint review |
|
|
|
|
---
|
|
|
|
### Sprint 1 Success Criteria
|
|
|
|
- ✅ All enhancements implemented (rate limiting, backpressure)
|
|
- ✅ Maven project builds successfully
|
|
- ✅ All port interfaces defined
|
|
- ✅ All domain models implemented
|
|
- ✅ Test coverage at 95%/90%
|
|
- ✅ Zero compilation errors
|
|
- ✅ Team trained in TDD
|
|
- ✅ All environments set up
|
|
|
|
---
|
|
|
|
## Sprint 2: Core Services (Weeks 3-4)
|
|
|
|
**Sprint Goal**: Implement business logic and orchestration services
|
|
|
|
**Status**: ⏳ Pending
|
|
**Story Points**: 42
|
|
**Planned Velocity**: 38-42 points
|
|
|
|
### User Stories
|
|
|
|
#### US-2.1: Implement ConfigurationManager
|
|
**Story Points**: 8
|
|
**Priority**: High
|
|
**Status**: ⏳ Pending
|
|
**Dependencies**: IConfigurationPort, Configuration domain model
|
|
|
|
**Acceptance Criteria**:
|
|
- [ ] Load configuration from JSON file
|
|
- [ ] Validate all parameters
|
|
- [ ] Terminate on validation failure (exit 1)
|
|
- [ ] Log validation errors
|
|
- [ ] Tests written first (TDD)
|
|
- [ ] 95% test coverage
|
|
|
|
---
|
|
|
|
#### US-2.2: Implement BufferManager
|
|
**Story Points**: 8
|
|
**Priority**: High
|
|
**Status**: ⏳ Pending
|
|
**Dependencies**: IBufferPort defined
|
|
|
|
**Acceptance Criteria**:
|
|
- [ ] Thread-safe circular buffer (ArrayBlockingQueue)
|
|
- [ ] FIFO overflow handling
|
|
- [ ] Atomic statistics tracking
|
|
- [ ] Tests written first (TDD)
|
|
- [ ] Concurrent stress tests pass
|
|
- [ ] 95% test coverage
|
|
|
|
---
|
|
|
|
#### US-2.3: Implement CollectionStatistics
|
|
**Story Points**: 3
|
|
**Priority**: Medium
|
|
**Status**: ⏳ Pending
|
|
**Dependencies**: BufferStatistics domain model
|
|
|
|
**Acceptance Criteria**:
|
|
- [ ] Atomic counters (totalPolls, totalErrors)
|
|
- [ ] Time-windowed queue (30s metrics)
|
|
- [ ] Thread-safe implementation
|
|
- [ ] Tests written first (TDD)
|
|
- [ ] 95% test coverage
|
|
|
|
---
|
|
|
|
#### US-2.4: Implement DataCollectionService
|
|
**Story Points**: 13
|
|
**Priority**: High
|
|
**Status**: ⏳ Pending
|
|
**Dependencies**: IHttpPollingPort, IBufferPort, ILoggingPort
|
|
|
|
**Acceptance Criteria**:
|
|
- [ ] HTTP endpoint polling orchestration
|
|
- [ ] Virtual thread pool for concurrent polling
|
|
- [ ] Data validation (size limits)
|
|
- [ ] JSON serialization with Base64
|
|
- [ ] Statistics tracking
|
|
- [ ] Tests written first (TDD)
|
|
- [ ] Unit tests with mocks pass
|
|
- [ ] Integration tests with WireMock pass
|
|
- [ ] 95% test coverage
|
|
|
|
---
|
|
|
|
#### US-2.5: Implement DataTransmissionService
|
|
**Story Points**: 13
|
|
**Priority**: High
|
|
**Status**: ⏳ Pending
|
|
**Dependencies**: IGrpcStreamPort, IBufferPort
|
|
|
|
**Acceptance Criteria**:
|
|
- [ ] Single consumer thread
|
|
- [ ] Batch accumulation (4MB or 1s limits)
|
|
- [ ] gRPC stream management
|
|
- [ ] Reconnection logic (5s retry)
|
|
- [ ] receiver_id = 99
|
|
- [ ] Tests written first (TDD)
|
|
- [ ] Unit tests with mock gRPC pass
|
|
- [ ] Integration tests with gRPC test server pass
|
|
- [ ] 95% test coverage
|
|
|
|
---
|
|
|
|
## Sprint 3: Secondary Adapters (Weeks 5-6)
|
|
|
|
**Sprint Goal**: Implement infrastructure adapters for HTTP and logging
|
|
|
|
**Status**: ⏳ Pending
|
|
**Story Points**: 40
|
|
|
|
### User Stories Summary
|
|
|
|
- **US-3.1**: Implement HttpPollingAdapter (13 points)
|
|
- **US-3.2**: Implement ExponentialBackoffAdapter (5 points)
|
|
- **US-3.3**: Implement FileLoggingAdapter (3 points)
|
|
- **US-3.4**: Implement GrpcStreamAdapter (13 points)
|
|
- **US-3.5**: Integration testing (8 points)
|
|
|
|
---
|
|
|
|
## Sprint 4: Primary Adapters & Application (Week 7)
|
|
|
|
**Sprint Goal**: Complete application entry point and primary adapters
|
|
|
|
**Status**: ⏳ Pending
|
|
**Story Points**: 35
|
|
|
|
### User Stories Summary
|
|
|
|
- **US-4.1**: Implement ConfigurationFileAdapter (5 points)
|
|
- **US-4.2**: Implement HealthCheckController (8 points)
|
|
- **US-4.3**: Implement HspApplication main (13 points)
|
|
- **US-4.4**: End-to-end startup tests (13 points)
|
|
|
|
---
|
|
|
|
## Sprint 5: Testing & Validation (Week 8)
|
|
|
|
**Sprint Goal**: Comprehensive testing and validation
|
|
|
|
**Status**: ⏳ Pending
|
|
**Story Points**: 42
|
|
|
|
### User Stories Summary
|
|
|
|
- **US-5.1**: Complete integration test suite (8 points)
|
|
- **US-5.2**: Execute performance tests (13 points)
|
|
- **US-5.3**: Execute reliability tests (8 points)
|
|
- **US-5.4**: Execute compliance tests (5 points)
|
|
- **US-5.5**: Validate coverage targets (8 points)
|
|
|
|
---
|
|
|
|
## Sprint 6: Integration & Deployment (Weeks 9-10)
|
|
|
|
**Sprint Goal**: End-to-end integration and deployment preparation
|
|
|
|
**Status**: ⏳ Pending
|
|
**Story Points**: 35
|
|
|
|
### User Stories Summary
|
|
|
|
- **US-6.1**: Execute E2E test scenarios (13 points)
|
|
- **US-6.2**: Finalize documentation (8 points)
|
|
- **US-6.3**: Create deployable artifacts (5 points)
|
|
- **US-6.4**: Validate in staging environment (13 points)
|
|
|
|
---
|
|
|
|
## Story Point Estimation Guide
|
|
|
|
| Points | Complexity | Effort | Examples |
|
|
|--------|-----------|--------|----------|
|
|
| **1** | Trivial | 1-2 hours | Simple configuration change |
|
|
| **2** | Simple | 2-4 hours | Simple utility class |
|
|
| **3** | Small | 4-8 hours | Domain model, simple adapter |
|
|
| **5** | Medium | 1-2 days | Complex adapter, service with dependencies |
|
|
| **8** | Large | 2-3 days | Core service, complex integration |
|
|
| **13** | Very Large | 3-5 days | Major component, multiple dependencies |
|
|
| **21** | Epic | 5+ days | Should be broken down into smaller stories |
|
|
|
|
---
|
|
|
|
## Definition of Done (DoD)
|
|
|
|
### Code Complete
|
|
- [ ] Tests written BEFORE implementation (TDD RED)
|
|
- [ ] All tests pass (TDD GREEN)
|
|
- [ ] Code refactored for quality (TDD REFACTOR)
|
|
- [ ] 95% line coverage, 90% branch coverage
|
|
- [ ] Zero critical bugs
|
|
- [ ] Code follows style guide
|
|
- [ ] Javadoc complete with @RequirementTrace
|
|
|
|
### Review Complete
|
|
- [ ] Code review approved (2 approvers)
|
|
- [ ] TDD workflow verified in commits
|
|
- [ ] Architecture review passed (if applicable)
|
|
- [ ] Security review passed (if applicable)
|
|
|
|
### Integration Complete
|
|
- [ ] Merged to develop branch
|
|
- [ ] CI/CD pipeline passes
|
|
- [ ] No merge conflicts
|
|
- [ ] Integration tests pass
|
|
|
|
### Documentation Complete
|
|
- [ ] Javadoc updated
|
|
- [ ] README updated (if applicable)
|
|
- [ ] Traceability matrix updated
|
|
- [ ] User documentation updated (if applicable)
|
|
|
|
---
|
|
|
|
## Retrospective Template
|
|
|
|
### What Went Well
|
|
- TBD after Sprint 1
|
|
|
|
### What Could Be Improved
|
|
- TBD after Sprint 1
|
|
|
|
### Action Items
|
|
- TBD after Sprint 1
|
|
|
|
---
|
|
|
|
## Velocity Tracking
|
|
|
|
| Sprint | Planned Points | Completed Points | Velocity | Trend |
|
|
|--------|----------------|------------------|----------|-------|
|
|
| Sprint 1 | 38 | - | - | - |
|
|
| Sprint 2 | 42 | - | - | - |
|
|
| Sprint 3 | 40 | - | - | - |
|
|
| Sprint 4 | 35 | - | - | - |
|
|
| Sprint 5 | 42 | - | - | - |
|
|
| Sprint 6 | 35 | - | - | - |
|
|
|
|
**Target Average Velocity**: 35-40 points per sprint
|
|
|
|
---
|
|
|
|
## Risk Register (Sprint Level)
|
|
|
|
| Risk | Sprint | Probability | Impact | Mitigation |
|
|
|------|--------|-------------|--------|------------|
|
|
| TDD adoption resistance | Sprint 1 | Medium | High | Mandatory training, pair programming |
|
|
| Coverage targets not met | Sprint 1 | Medium | High | Start early, allocate time, QA support |
|
|
| gRPC complexity | Sprint 3 | Medium | High | Early prototype, expert on team |
|
|
| Performance issues | Sprint 5 | Low | High | Early benchmarking, profiling tools |
|
|
|
|
---
|
|
|
|
## Notes
|
|
|
|
- Sprint planning happens on Day 1 of each sprint
|
|
- Daily standups at 9:00 AM (15 minutes)
|
|
- Sprint review on last day of sprint (2 hours)
|
|
- Sprint retrospective after review (1 hour)
|
|
- TDD compliance is mandatory (enforced in code review)
|
|
- Burndown charts updated daily
|
|
- Velocity calculated after each sprint
|
|
|
|
**Last Update**: 2025-11-20
|
|
**Next Sprint Planning**: Sprint 1 Kickoff
|